Maumee River -> Western Lake Erie

Maumee Recovery

A 20-year operating system for Lake Erie, farmers, and Toledo's waterfront value.

The opportunity

Ohio already knows enough to act.

The science base is mature. The missing layer is coordination: a durable program that converts monitoring, targets, public money, and farm practice into verified phosphorus reduction.

The problem

The old pollution problem was pipes. The current problem is the watershed.

The measure

Spring Maumee phosphorus load is the operating target.

Target window Mar-Jul
TMDL target 860 MT
Goal 9/10 years

Point Place

Make the downstream value case visible.

Point Place is not only an algae story. It is algae perception, flood exposure, infrastructure, insurance risk, and under-used waterfront value. A serious plan should track all of them together.

The operating system

Six moves.

  1. Public Maumee Recovery Atlas
  2. Highest-impact acres and ditches first
  3. Farmer performance payments
  4. Wetlands and edge treatment at scale
  5. Enforceable backstop where voluntary work fails
  6. Point Place flood and value recovery layer

First 24 months

Build the proof layer.

The ask

Create a 20-year Maumee Recovery Program.

Stable funding. Public metrics. Farmer compensation. Scientific oversight. Enforceable backstop. Waterfront value recovery.